In order to keep the height under the 4m limit, we designed the building with a crown roof – pitched to a certain height and then flat across the top. The main structure was brick, to comply with the boundary fire regulations, and we adhered to thermal performance regs with thick insulation in the roof and walls, thermally ‘broken’ aluminium bi-fold doors and Velux windows bringing in light.
The project took around 12 weeks to complete, which is standard for a job of this nature. James has fitted out his new gym and office with all the equipment he needs, full length mirrors, sound system and TV, and the whole ensemble makes a compelling addition to his home.
Want to fit more fitness into your life?