Imagine waking up one morning and realising that your home could have an extra bedroom, a larger master suite or even an entirely new floor, without having to move house or sacrifice valuable garden space.
For many homeowners, building upwards sounds like an ideal solution. But there is one question that often comes first: Can you add another storey to your house without planning permission?
The answer is yes, in certain circumstances. In England, permitted development rights introduced through the Town and Country Planning (General Permitted Development) (England) (Amendment) (No. 2) Order 2020 allow eligible homeowners to add additional storeys to existing houses without submitting a full planning application.
However, these rights come with specific eligibility criteria, height restrictions, design requirements and a prior approval process. Simply deciding to build upwards does not mean you can start construction.
Let’s explore what homeowners need to know before planning an upward extension.
Yes. Certain homeowners in England can add one or two additional storeys to their existing houses under permitted development rights.
These rights fall under Class AA of Part 1, Schedule 2 of the Town and Country Planning (General Permitted Development) (England) Order 2015, introduced by the 2020 Amendment Order.
The provision allows eligible homeowners to build upwards without applying for full planning permission, provided they meet all the relevant conditions and obtain the local authority’s prior approval before starting work.
It is important to understand that permitted development does not mean unrestricted development. The property, proposed design, overall height and location must all satisfy the legislation.
Class AA is a specific permitted development right that allows the enlargement of an existing house through the construction of additional storeys immediately above its topmost storey.
It was introduced to make it easier to create additional living space without extending the building’s footprint.
For homeowners, this can offer an alternative to conventional extensions, particularly where garden space is limited or moving to a larger property is not practical.
The right generally allows:
• Single-storey houses: One additional storey.
• Houses with two or more storeys: Up to two additional storeys.
The additional storeys must be constructed above the principal part of the existing house. This means that a lower-height front, side or rear extension cannot automatically be used as the base for the upward extension.
Although Class AA allows up to two additional storeys in qualifying circumstances, the proposed development must comply with strict height limitations.
There are also important height restrictions:
• The completed house must not exceed 18 metres in overall height.
• A single-storey house cannot increase its roof height by more than 3.5 metres.|
• A house with more than one storey cannot increase its roof height by more than 7 metres.
• For semi-detached and terraced houses, the completed roof must not be more than 3.5 metres higher than the relevant neighbouring roof or roofs.
• Each additional storey must not exceed 3 metres in internal floor-to-ceiling height, or the height of an existing storey in the principal part of the house, whichever is lower.
These measurements matter. A proposal that looks modest from the street may still exceed the permitted development limits once the existing roof and neighbouring buildings are assessed.
Not every house qualifies for Class AA permitted development rights. Before considering designs or construction costs, homeowners should check whether their property meets the basic eligibility criteria.
1. The age of the property
The existing house must have been constructed between 1 July 1948 and 28 October 2018.
2. The property must be a house
The right does not apply to flats or buildings containing one or more flats.
3. Previous upward extensions
The existing house must not already have been enlarged by adding one or more storeys above the original house, whether under Class AA or through another permission.
4. Protected locations
The right is not available for houses situated on Article 2(3) land or Sites of Special Scientific Interest. Article 2(3) land includes designated areas such as conservation areas, National Parks, the Broads, National Landscapes and World Heritage Sites.
5. The proposed design
The additional storeys must be built on the principal part of the house. Materials must have a similar appearance to the existing exterior, and the original roof pitch of the principal part must be retained.
There are also restrictions on side-facing windows, visible external support structures and engineering works.
These requirements should be checked against the full legislation before assuming a property qualifies.
One of the biggest misconceptions about permitted development is that homeowners can begin construction immediately if their project meets the permitted development criteria.
That is not the case with Class AA.
You must obtain prior approval from your local planning authority before starting construction.
Prior approval allows the council to assess specific aspects of the proposed development, including:
• The impact on neighbouring properties, including privacy, overlooking and loss of light.
• The external appearance of the proposed upward extension.
• Impacts relating to air traffic and defence assets.
• The effect on protected views, where applicable.
• The construction management arrangements.
The application must include the information and supporting documents required by the legislation. The council will assess the proposal against the relevant prior approval matters rather than reconsidering every aspect of a full planning application.
It is therefore important to prepare accurate drawings and supporting information before submitting an application.
If your property or proposed design does not meet the Class AA requirements, you may need to submit a full planning application.
For example, full planning permission may be required if:
• Your house was built before 1 July 1948 or after 28 October 2018.
• Your property is in a protected location excluded from Class AA.
• You want to add more storeys or exceed the permitted height limits.
• The proposed design does not meet the restrictions on materials, roof pitch or building position.
• Your house has already been extended upwards.
• Your permitted development rights have been removed by a planning condition or another relevant restriction.
However, failing to qualify under Class AA does not necessarily mean that your project cannot go ahead. A full
planning application may still be possible, depending on the property, design and local planning policies.
Planning permission is only one part of an upward extension project. Before committing to the work, homeowners should consider several other important factors.
Structural feasibility: Can the existing foundations, walls and structural framework support the additional weight? A structural engineer should assess the building and advise on the necessary strengthening work.
Building regulations: An upward extension must comply with applicable building regulations, including structural safety, fire safety, insulation, ventilation and means of escape.
Neighbouring properties: Even when a proposal falls within permitted development, its design and construction can affect neighbouring homes. Privacy, overlooking, daylight and construction disruption should be considered carefully.
Access and internal layout: Think about where the new staircase will go, how the additional rooms will connect with the existing home and whether the layout will remain practical.
Budget and construction: Building upwards can involve significant structural work, temporary weather protection, scaffolding and changes to existing services. Obtain professional advice and a realistic cost assessment before proceeding.
Can I add two floors to my existing house without planning permission?
Potentially, yes. Under Class AA, an eligible house with two or more existing storeys can add up to two additional storeys, subject to the height, design, location and other restrictions. Prior approval is required.
Do I need planning permission for a second-storey extension?
Not necessarily. A second-storey extension may qualify under permitted development, but the applicable rights depend on the type of development. Class AA specifically covers additional storeys constructed immediately above the topmost storey of an eligible house. Other types of extensions may be assessed under different rules.
Can I add another storey to a terraced or semi-detached house?
Yes, potentially. Class AA can apply to eligible terraced and semi-detached houses. However, additional restrictions apply to the height of the completed roof in relation to neighbouring properties.
How long does prior approval take?
The statutory procedure for Class AA includes an eight-week decision period. However, homeowners should check the applicable application procedure and allow time to prepare drawings and supporting documents. Construction must not begin before the required prior approval has been obtained.
Does permitted development remove the need for building regulations approval?
No. Planning permission and building regulations are separate requirements. Even if an upward extension qualifies as permitted development, building regulations approval and other relevant consents may still be necessary.
Adding another storey can transform a home, create much-needed living space and help homeowners make better use of their existing property. But the success of an upward extension depends on more than whether permitted development rights appear to apply.
The property’s eligibility, structural condition, design, height restrictions and prior approval requirements all need careful consideration.
At Greenway Associates, we help homeowners explore architectural design options, assess planning requirements and prepare the drawings and documentation needed for their projects.
If you are considering adding another storey to your house, get in touch with our team to discuss your property and
understand the options available before you commit to construction.
Contact Greenway Associates to discuss your upward extension project.
Editorial note
This article concerns England. Permitted development rules differ in Wales, Scotland and Northern Ireland. The original 2020
amendment should not be treated as the complete current legislation; check the consolidated GPDO and subsequent amendments, and obtain property-specific professional advice.
Suggested official references
General Permitted Development Order 2015 – Part 1, Schedule 2
SI 2020/755 – original amendment
GOV.UK – When is permission required?