Imagine this: You’re all set to build your dream extension, only to discover a Thames Water manhole lurking in your garden, threatening to derail your plans. Sounds like a nightmare, right? You’re not alone. In fact, Thames Water manages over 100,000 kilometers of public sewers, many of which run through private properties. But here’s the kicker – ignoring that manhole could cost you your entire extension. Let’s dive into the world of Build Over Agreements and uncover how you can turn this potential roadblock into a stepping stone for your home improvement journey.
Table Of Contents
A Build Over Agreement is a formal approval from Thames Water, certifying that your proposed construction won’t harm their sewer system. Without this agreement, your entire project could be at risk — halted mid-construction or, in the worst-case scenario, ordered to be torn down.
You’ll need a Build Over Agreement if:
Pro Tip: Check your property’s title deeds or consult a surveyor to identify any public sewers on your land.
Thames Water Manhole Build Over Agreement
Skipping the Build Over Agreement is like playing Russian roulette with your extension. Here’s why it’s non-negotiable:
Here is the information required to secure Thames Water Manhole Build Over Agreement:
For all three classes, you’ll need to upload the following:
Thames Water’s role doesn’t end at approval; they’re also responsible for the ongoing maintenance of public sewers and lateral drains. For private drains, however, the responsibility lies with the property owner.
Thames Water has strict criteria for approving Build Over Agreements. Key specifications include:
Remember: These specifications ensure both your extension and the sewer system remain safe and accessible.
A table showing Build Over Agreement costs based on sewer class
The cost of your Build Over Agreement depends on the sewer class:
Class 1 (≤150mm diameter): £105
Class 2 (151-375mm diameter): £445
Class 3 (>375mm diameter): £535 + additional legal costs
Note: Prices are subject to annual review. Check Thames Water’s website for the most current fees.
Securing a Build Over Agreement is not just a bureaucratic hurdle; it’s a vital step in protecting both your property and Thames Water’s infrastructure. By following the guidelines and obtaining the necessary permissions, you can move forward with your home extension project with confidence, knowing that your work is compliant and your investment is secure.
If you’re unsure about any part of the process, consult a professional or reach out to Thames Water directly. Don’t let a small oversight lead to significant setbacks—ensure your project is on the right track from the start.
Ready to tackle that Thames Water manhole in your garden? Don’t let it flush your extension dreams away! Contact our extension experts today for a free consultation on navigating the Build Over Agreement process.